DCC Project Status (Dec05) | Oral presentation in collaboration meeting |
DCC Status (Nov05) | Oral presentation in collaboration meeting |
DCS integration and Magnet Test | Oral presentation in collaboration meeting |
Design of a Data Concentrator Card for CMS ECAL | Oral presentation in international conference |
ECAL Software Review: Control, Operation and Readout | Oral presentation in collaboration meeting |
Laser data DAQ | Oral presentation in collaboration meeting |
Run Issues, Trigger and Detectors | Oral presentation in collaboration meeting |
Status of DCS Integration | Oral presentation in collaboration meeting |
Status of the ECAL TriDAS at the magnet test and final system | Oral presentation in collaboration meeting |
Status of the SLB project (Aug05) | Oral presentation in collaboration meeting |
Status of the SLB project (Dec05) | Oral presentation in collaboration meeting |
Status of the SLB project (Oct05) | Oral presentation in collaboration meeting |
Status of the SLB project (Sep05) | Oral presentation in collaboration meeting |
Status of UED study (4 leptons final state) | Oral presentation in collaboration meeting |
The CMS trigger system | Oral presentation in international conference |
The Data Acquisition System of the CMS ECAL Test Beam of 2004 | Oral presentation in international conference |
Tri-and tetra-lepton triggers for SUSY-BSM | Oral presentation in collaboration meeting |
Trigger Software and Integration Issues | Oral presentation in collaboration meeting |
Trigger Software Summary | Oral presentation in collaboration meeting |
UED Analysis Update | Oral presentation in collaboration meeting |
UED in 4-leptons Update | Oral presentation in collaboration meeting |